Southeast.
Regional Manager
Eric Anderson
Vice President
(240) 459-6167
Email Eric
New Projects
John Morton
Business Development Manager
(813) 422-5092
Email John
Careers
To learn more about ISEC careers, visit link below.
Learn More
Partnerships
To learn more about ISEC partnerships, visit link below.
Learn More
Regional Office
The Winter Playground of the Nation
2202 N. West Shore Boulevard
Suite 200
Tampa, FL 33607
Driving Directions
Eric Anderson
Vice President
(240) 459-6167
Email Eric
John Morton
Business Development Manager
(813) 422-5092
Email John
Sarah Ledford
HR Generalist
(240) 459-6172
Email Sarah
Local Offices
100 Hartsfield Centre Parkway
Suite 500
Atlanta , GA 30354
Driving Directions
433 Plaza Real
Suite 275
Boca Raton, FL 33432
Driving Directions
111 N. Orange Ave
Suite 800
Orlando, FL 32801
Driving Directions
Have a Question?
The Latest In:
Southeast Region
Alina Residences
Challenges
Executing hundreds of precisely aligned custom wood blades required exceptional design clarity, coordination, and precision to maintain geometric accuracy from digital modeling through final installation. The complexity of layered elements demanded a highly controlled approach to ensure consistency, and alignment to the architectural vision.
Solutions
The team created a custom 3D parametric model that transformed the design process. Real-time updates with the architect allowed rapid adjustments to complex geometries, while the model’s built-in intelligence generated fabrication-ready files automatically. Through close collaboration with our vendor, every element was produced with accuracy and consistency, ensuring the design vision was fully realized.
Results
Lessons from the initial phase informed refinements for the more complex second phase, resulting in an installation that closely mirrored the original design vision. By controlling the digital model and fabrication data, the team maintained exceptional precision, streamlined coordination, and delivered a finished product that reflected both technical excellence and craftsmanship.
Lessons Learned
Early alignment approaches revealed opportunities to enhance installation precision. For Phase 2, the team introduced vertical dowels to allow independent alignment of layers, establishing a higher standard of accuracy. Combined with the approved digital model and digital fabrication methods, this refined process ensured consistent, near-perfect execution from design through installation.