Southeast.
Regional Manager
Eric Anderson
Vice President
(240) 459-6167
Email Eric
New Projects
John Morton
Business Development Manager
(813) 422-5092
Email John
Careers
To learn more about ISEC careers, visit link below.
Learn More
Partnerships
To learn more about ISEC partnerships, visit link below.
Learn More
Regional Office
The Winter Playground of the Nation
2202 N. West Shore Boulevard
Suite 200
Tampa, FL 33607
Driving Directions
Eric Anderson
Vice President
(240) 459-6167
Email Eric
John Morton
Business Development Manager
(813) 422-5092
Email John
Sarah Ledford
HR Generalist
(240) 459-6172
Email Sarah
Local Offices
100 Hartsfield Centre Parkway
Suite 500
Atlanta , GA 30354
Driving Directions
433 Plaza Real
Suite 275
Boca Raton, FL 33432
Driving Directions
111 N. Orange Ave
Suite 800
Orlando, FL 32801
Driving Directions
Have a Question?
The Latest In:
Southeast Region
Alina Residences
Challenges
The project faced early setbacks when the vendor struggled to secure timely shop drawing approvals, putting fabrication schedules at risk. To keep the project moving, the ISEC VDC (Virtual Design and Construction) team stepped in to develop a parametric model that could fast-track design approvals and serve as the foundation for precise fabrication.
Solutions
The team created a custom 3D parametric model that transformed the design process. Real-time updates with the architect allowed rapid adjustments to complex geometries, while the model’s built-in intelligence generated fabrication-ready files automatically. Through close collaboration with our vendor, every element was produced with accuracy and consistency, ensuring the design vision was fully realized.
Results
Insights from the first phase informed refinements for the more complex second phase, resulting in a final installation that closely mirrored the original design intent. By controlling the digital model and fabrication data, the team maintained exceptional precision, streamlined coordination, and delivered a finished product that reflected both technical excellence and craftsmanship.
Lessons Learned
Initial alignment methods caused minor misalignments between layers. For Phase 2, the team introduced vertical dowels for independent alignment, setting a new standard for installation accuracy. Paired with the approved digital model and digital fabrication methods, this refined process ensured near-perfect execution from design through installation.